Installation of Electrical Outlet and Breaker for PSO Occidental Mindoro
Installation of Breaker and Panel lot 1
INCLUSION:
- includes 1 panel with 9 branches
- includes 8 pcs breaker 20 A
- 15pcs molding No.1
- 1 bag clamp
- flexible hose
- 10pcs molding No. 34
- 2 1/2 box No.10 wire
- labor
Installation and Revision of Electrical Outlet lot 1
INCLUSION:
- 3 gang outlet
- surface utility box
- No. 12 Wire
- Breaker
- 25 pcs molding No. 3/4
- sealant
- blind rivet
- labor
NOTE:
-Include Warranty for the Item/ Service /Installation
-Payment for the supplies/services/activity will be based
on the actual billing.
-Incase of unforeseen events, the PSA reserve the rights to cancel/reschedule the activity.
Place of Delivery: Europhil Building , National Highway, Barangay Payompon, Mamburao, Occidental Mindoro
***Nothing Follows***